Smriti Built TOILETS in Schools – No Water Sewer Toilet Paper
Dear VT, I can understand your frustration – but it is a fact that majority of the Ministers – had they appeared in any competitive test - may not have scored even 10%-20% marks.
The only Foreign Trained Minister finally was given JUNK assignment of Running Air India was actually Scheming to Cut Down PSU – Enriching Sumit Sinha’s ReNew.
Education Minister was so pathetic – after 25 months in power claimed -
‘Her Best Achievement Was to Build Toilets in Schools – most don’t have Water or Toilet Paper and have Septic Tanks which overflows in Monsoon Months.’
Can you imagine in a poor country – Piyush Goyal and PM admits – over 50% population don’t have electric supply but 84,732 MW of Capacity was Off Line or Generators not working? Only 1.1% new villages could be electrified in 25 months.
Here in another report you can see against Plan to Generate 3239 MU – actual generation was only 2762 MU for July03 and Generation for April01 to July03 period was 305 BU in 94 days and average of 3234 MU per day – This average generation of 134,761 MW against install capacity of 303,083 MW – 44% Load Factor in hottest days of the year when day temperatures peaked to beyond 45 Degrees.
Generation of 2762 MU in a day is 115,083 MW average load or 38% Load Factor – over 25% is lost in transmission – 28.5% of Consumption Factor.
P-13 - In April-May2016 months against annual target of 16,654 MW FY17 Capacity Additions achievement so far in two months is 250 MW or 1.5% Only. P-20. Against annual target of 15,700 Kilometers of 400 KV and above Transmission Capacity Additions achievement is 828 MW or 5.27%.
2014-16 CEA Monitored Capacity Growth 21.6% - Generation 14.5%
http://www.cea.nic.in/reports/monthly/generation/2014/March/actual/opm_01.pdf ;http://www.cea.nic.in/reports/monthly/generation/2016/March/actual/opm_01.pdf
Year
|
Monitored Capacity MW
|
April-June Generation MU
|
2013-14
|
213,169
|
967,150
|
2014-15
|
235,696
|
1048,672
|
2015-16
|
259,415
|
1107,822
|
UPA Electrified 130,000 Villages in 10 Yrs Approx @13,000/yr 21,396 Villages were Un-electrified By February2014 – But still On May2016 6784 Villages are Un-electrified.
RS Prasad in 25 months couldn’t Fix Call Drop, Roll Out Rural Broadband.
Railways Productivity Has Declined – Prabhu has Lunatic Ideas – Bullet Trains, MEGA Railway Stations At Existing Inaccessible sites like New Delhi Rly Stn.
Growth of deposit and credit (y-o-y) declined to 8.6 per cent /9.3 per cent respectively during 2015-16 from 10.7 per cent / 9.8 per cent respectively a year ago. The deceleration in deposits and credit during 2015-16 was broad based across all population groups.
Can GDP Grow 8% As Real Deposits Grow 2%, ‘0’ Per Capita?
Ravinder Singh, Inventor & Consultant, INNOVATIVE TECHNOLOGIES AND PROJECTS
Y-77, Hauz Khas, New Delhi-110016, India. Ph; 091- 9871056471, 9718280435, 9650421857
No comments:
Post a Comment